Menu
  • © 2026 Clinton Engineering
  • Office Hours: Mon–Fri 8am–4:30pm

News image

clinton iowa

Case Study | Bickelhaupt Arboretum

Founded in 1970 by Robert and Frances Bickelhaupt, the 14-acre Bickelhaupt Arboretum has served as a regional destination for conservation, education, and community engagement for more than 50 years. In 2014, the property was donated to Clinton Community College and the Paul B. Sharar Foundation to continue its mission of lifelong learning and sustainability. 

In 2026, the Arboretum underwent a transformative $5 million renovation. The former Bickelhaupt family residence converted into a modern education and event center for Eastern Iowa Community Colleges. Clinton Engineering Co., Inc. served as construction manager, helping preserve the arboretum’s legacy while expanding its educational and community impact for future generations.

 

The Challenge

Converting a historic residence into a modern educational and event center required balancing historic preservation, accessibility, and sustainability, while protecting the building’s historic character.

Signature Project Features

Structural glass floor over the former swimming pool  

Chihuly-inspired art installation beneath the glass

Historic residence transformed into flexible education and event space

New educational, event, and exhibit spaces

Site restoration and sustainability improvements 

 

 

Clinton Engineering’s Approach

As construction manager, Clinton Engineering guided the project through every phase of construction, coordinating the owner, Studio 483 design team, and specialty contractors. The team helped resolve complex field conditions, manage quality, keep the project on schedule, and protect the vision for the facility.

Most of the original residence was renovated into flexible educational and event space while maintaining the architectural character of the home.

Interior improvements included new flooring and wall finishes, modern electrical fixtures, a new HVAC system, and additional storage rooms and restrooms to support expanded programming and events. 

 

 

Highlights 

Technical Innovation

One of the project’s most unique elements was the installation of a custom structural glass floor above the former swimming pool. Beneath the glass sits an illuminated art installation curated by Gabi Torres and fabricated by Hot Glass, Inc. 

To reduce fabrication risk, Clinton Engineering recommended 3D laser scanning of the existing pool before fabrication began. The scan captured exact field conditions, allowing the custom steel framing and structural glass system to be fabricated within approximately ¼-inch tolerances and minimizing field modifications during installation. 

 

Educational and Community Spaces

Designed by Greg Gowey of Studio 483, the renovation introduced several new educational and community spaces, including:

  • A 2,033-square-foot event center with floor-to-ceiling windows and flexible seating
  • A 2,200-square-foot outdoor deck accommodating up to 100 guests
  • Accessible gathering areas and a new gazebo throughout the site
  • Dedicated learning center rooms and library space
  • Welcome Pavilion for visitors and educational materials
  • Walk-through animal exhibit featuring native species and the arboretum’s taxidermy collection

Sustainability & Site Improvements

The project included several environmental and infrastructure enhancements: streambank erosion mitigation, landscape restoration, parking lot improvements, and installation of a permeable paver parking lot.

Clinton Engineering also assisted EICC in securing ISWEP grant funding to support the permeable pavement installation, helping advance the project’s sustainability goals.

 

The Result

Today, the renovated Bickelhaupt Arboretum serves as a destination for education, conferences, weddings, performances, and community events. Through collaborative construction management, problem-solving, and attention to the facility’s historic character, Clinton Engineering transformed one of Clinton’s most treasured landmarks into a space that will serve the community for generations to come.

Facility Maintenance Services at CEC

When people hear “facility maintenance,” they often think of basic upkeep—mowing grass or plowing snow. But it’s much bigger than that, especially on industrial, commercial, and municipal sites. 

At Clinton Engineering, facility maintenance means keeping critical infrastructure safe, functional, and ready to perform every day. 

Here’s a simple breakdown of what that really looks like. 

 

What Types of Work Fall Under Facility Maintenance? 

Clinton Engineering’s facility maintenance services provide a comprehensive, all-in-one solution for nearly any maintenance need a facility may face. If something falls outside our scope, we coordinate trusted partners to get the job done right.  

As part of McCarthy-Bush Corporation, we have a large pool of resources to pull from and deliver whatever our clients need. In short: if it affects how your facility operates, we can help. 

 

Our facility maintenance services cover a broad range of disciplines, including: 

  • Concrete repairs and replacement 
  • Steel erection and structural support 
  • Painting and coatings 
  • Welding and fabrication 
  • Snow removal and ice control 
  • Grass and rough grass cutting 
  • Traffic control 
  • Civil, underground, and utility work 

This wide-ranging capability allows clients to rely on one partner instead of juggling multiple contractors. 


Why Do Clients Call Us?
 

Clients typically call Clinton Engineering when they’re dealing with urgent, time-sensitive issues. These are often situations where infrastructure has failed, or safety is at risk—such as damaged concrete or utility issues that need immediate attention. We’ve supported these clients with everything from emergency repairs to ongoing maintenance work that keeps their facilities running without disruption. 

 

Preventative Work  

One of the most valuable tools in facility maintenance is inspection. Routine inspections performed by our team or qualified subcontractors can identify early signs of wear, damage, or failure. Catching these issues early allows repairs or replacements to happen before they turn into costly shutdowns, safety hazards, or emergency situations. 

Urgent Maintenance Issues  

Some of the urgent calls we handle include: 

  • Water main failures 
  • Fire hydrant excavations and repairs 
  • Cracked, broken, or spalling roadways 
  • Snow and ice emergencies 

When these issues arise, timing matters. Having a trusted maintenance partner makes all the difference. 

 

What Sets Clinton Engineering Apart?  

Clinton Engineering stands out because of our versatility. We offer a comprehensive, multi-faceted range of services under one roof, backed by experienced teams who understand active, operating environments. Our ability to self-perform services allows us to respond quickly, maintain quality control, and adapt as conditions change. 

We approach every project with detailed planning, clear communication, and strict adherence to all applicable safety practices. Our teams are experienced in coordinating work to minimize disruption while keeping people and operations safe. 

 

Need a maintenance partner you can count on? Call today to find out more about how to get our maintenance team on your call list.

Give Us a Call

 

Have an inquiry?
Contact us.